Our Process: Asphalt Shingle Roof Installation
Katelyn Lewis • June 28, 2022
How is an asphalt shingle roof properly installed? So glad you asked!
Let's walk through the process together, using aerial photos from a recent Retex roof replacement project in the Surreywood neighborhood of North Chesterfield, VA.
Here's our simple process:
1: Tear off the existing shingles, starting from the ridge and moving down the roof.

2: Assess and replace any decking that's damaged, rotten, or soft. At this step, we also cut along the ridge so we could install a ridge vent, enabling passive attic ventilation for this home.

3: Install aluminum drip edge, Ice & Water Shield, and synthetic underlayment. This layer will protect your roof decking! We also install any skylights, pipe collars around plumbing vent pipes, and flashing at this stage.

4, 5 & 6: Transfer shingles to roof and begin shingle installation.
7: Smile at the awesome new roof and clean up!

Our crews also go the extra mile to clean up your yard of debris.
We run a nail rake multiple times to ensure a clean and safe environment, and once everything's looking good we will haul away and dispose of the debris (this final photo was captured post-cleanup, pre-dumpster pickup).
Want to discuss your roofing project? Call us at 804-442-3314 or click the button below to get in touch with us.

This Midlothian homeowner originally reached out to Retex in October 2023 for a roof repair for a leak in her kitchen as well as a roof replacement estimate. RETEX’s Andy Connor met with her, gave her both quotes, and we repaired her roof. She reached back out to Andy in March 2024, ready to move forward with RETEX on replacing her roof.